DOD Contract : SP047504MFN39 | SP0475-04-M-FN39

There are 6 government contract actions against this contract, with quantities ranging from 12 and 20. Execution of this contract spans from May 5, 2004 and May 5, 2004. The procuring agency is 97AS: Defense Logistics Agency.

It has been awarded to BEST FOAM FABRICATOR, INC located in , IL.

The item name for this contract is: PARTS KIT,FUEL TANK.

Back to Agency ListRecent contract actions
DOD ContractsDelivery OrderLine ItemQuantityPriceAgencyAward Date
sp047504mfn39MODF0001AAFree Trial97AS: Defense Logistics Agency2004-05-17
sp047504mfn39MODF0001ABFree Trial97AS: Defense Logistics Agency2004-05-17
sp047504mfn39MODF0001ACFree Trial97AS: Defense Logistics Agency2004-05-17
sp047504mfn39MODF0001ADFree Trial97AS: Defense Logistics Agency2004-05-17
sp047504mfn39MODF0001AEFree Trial97AS: Defense Logistics Agency2004-05-17
sp047504mfn39MODF0001AFFree Trial97AS: Defense Logistics Agency2004-05-17
Back to Agency List See all SP0475 contracts

Federal Supply Classes for SP047504MFN39

1560 - Airframe Structural Components

Includes: Includes Flight Control Surfaces; Internal and External Auxiliary Fuel Tanks; Exhaust Systems; Pylons, Trim Tabs; Aircraft.

Excludes: Excludes Fitted Covers; Helicopter Rotor Brake System Components; Aircraft Loose Equipment and Alternate Mission Configuration Equipment stored on board the aircraft.

Note: Note-This class includes fabricated system parts that are permanently attached or peculiar to the integral airframe of an aircraft, such as support structural components, spars, ribs, ailerons, stabilizers, bulkheads.

See full contract details by trying BidLink Free for 7 days

Get complete contract details